PROGRAM PENGGANTIAN PAIP LAMA BAGI TAHUN 2020 DI NEGERI JOHOR DAERAH PONTIAN (PAKEJ 2) ("WORKS")
 
JABATAN KERJA : Pengurusan Aset Air Berhad (PAAB)
JABATAN PELAKSANA : Jabatan Projek Ranhill SAJ Sdn Bhd
KONTRAKTOR UTAMA : Jalur Cahaya Sdn Bhd
SUB KONTRAKTOR : TSK Synergy Sdn Bhd
SUB PAKEJ : PTN10 - PONTIAN
DMA : 1 - PTN10 - PN03 - Batu 34

No. Location Sheet No. Date Chainage Item No Item No Item No Item No Item No Item No Item No Item No Item No Item No
1 6 13 18 20 23 27 40 114 336
JC Numbering PTN10.1 PTN10.6 PTN10.12 PTN10.17 PTN10.19 PTN10.22 PTN10.26 PTN10.38 PTN10.71 PTN10.218
Site clearance- Clear all bushes and shrubs and fell, remove and dispose off Trench Excavation - 125mm ND Exc in track, gravel & erath road Exc in high ground water level Remove unsuitable material Filling wash sand Restoration of Road - crusher run 450mm thk HDPE PE100 Pipes 125mm ND Coupler - 125mm ND Cut-off Trees
Main & Comm
1 PN 03/02 - Lorong Salimen 1 07/05/2023 54.00 3.00 32.40 3.00 5.00 54.00
2 PN 03/02 - Lorong Salimen 2 08/05/2023 97.20 36.00 21.60 6.59 36.00 1.00
3 PN 03/02 - Lorong Salimen 3 09/05/2023 145.80 54.00 32.40 9.88 54.00 1.00
4 PN 03/02 - Lorong Salimen 4 10/05/2023 145.80 54.00 32.40 2.58 9.88 54.00 1.00 3.00
5 PN03/ 01B - Lrg Hj Rasul 1 11/05/2023 145.00 2.64 5.40 7.50 8.23 4.40 100.00
6 PN03/ 01B - Lrg Hj Rasul 2 14/05/2023 12.60 27.00 1.62 16.20 15.00 4.94 4.32 27.00 1.00
7 PN03/ 01B - Lrg Hj Rasul 3 15/05/2023 72.00 7.50 6.59
401.40 442.00 7.26 140.40 35.58 46.11 13.72 325.00 4.00 3.00

Disediakan Oleh :



Disemak Oleh :



Disahkan Oleh :



Kontraktor Cop : Inspektor Kontrak (D) Cop : Eksekutif Cop :